×

Railway Viaduct Gabrovica

Second track of the Divača - Koper Railway alignment, section Črni Kal – Koper, Slovenia

Project type
Railway Viaduct
Location
Črni Kal, Slovenia
Year
Ongoing
Ponting Services
Preliminary / Final / Tender design
Length
424 meters
Max. span
64 meters
Span arrangement
52.0 + 5 x 64.0 + 52.0 = 424.0
Pier height
Up to 64 meters
Width
10,45 meters
Foundation type
Deep on wells, diameter 10 m
Structure
Prestressed concrete U-shape girder
Construction
Incremental launching method
Client
Republic of Slovenia, Ministry of infrastructure
Cooperators
Ponting - Pipenbaher Consulting Engineers
Contractor
Yapi Merkezi Insaat