×

Footbridge in Ptuj

The footbridge is located in the centre of the historical town Ptuj, in a sensitive environment with a high historical value. Despite of the fact that the bridge is designed as a modern composite structure, its structural elements resemble old steel and wooden bridges.

The 154-metre-long composite bridge superstructure rests on four river and two bank supports, the geometry of which resembles the former bridge supports. The steel truss structure is connected with a thin concrete slab, which ends with the curbs, into which a stainless-steel fence is anchored. The bridge is discreetly illuminated.

The grand opening of the bridge took place at the evening on August 2, 1997.

Authors and designers of the bridge engineer Marjan Pipenbaher and architect Peter Gabrijelčič were awarded by ECCS (European Convention for Constructional Steelwork) with European Award for Steel Structures.

Project type
Pedestrian bridge
Location
Ptuj, Slovenia
Year
1997
Status
Completed
Ponting Services
Conceptual design / Preliminary / Final / Detailed design
Length
154 meters
Max. span
34 meters
Structure
Composit structure
Construction
Incremental launching construction method
Client
City of Ptuj
Contractor
SCT d.d.
Awards
Award CSS of CCIS 1999 – Ljubljana, Slovenia
European Award for Steel Structures, ECCS (European Convention for Constructional Steelwork) - London, England, 1999