Foot and Cycle Bridge in Irča vas

The pedestrian and cycle bridge in Irča vas is designed as a stress-ribbon bridge with 130 m span. It crosses the Krka River between Lastovče and Groblje and connects the bike path on the left bank of the Krka River with the existing traffic areas on the right bank, as part of the cycling connection Drska-Bršljin.

Structural and architectural concept of new footbridge over the Krka River, prepared by authors Marjan Pipenbaher, Tomaž Weingerl, Blaž Budja and Rok Jereb from Ponting Bridges, Pipenbaher Consulting Engineers and Jereb and Budja Architects design offices was awarded with 1st prize on design competition among 13 bridge competing entries in 2017. The bridge convinced the jury with its structural concept, transparency and peaceful integration into the natural environment.

Although the beautiful Krka River is mostly serene, flooding is common. The lowest point of the bridge is about four meters above the level of the 100-year flood, and at normal water level it is about 11 meters above the level of the river.

»We wanted to connect the banks of the Krka River in one step, with minimum impact to the environment. The bridge is without supports in the riverbed and softly connects to the banks on both sides without noticeable supports or high embankments,« explained Marjan Pipenbaher and Tomaž Weingerl, and added: »The chosen stress-ribbon bridge concept is one of the most efficient and contemporary  footbridge type. It is a unique bridge in wider region of SE Europe.«

The bridge superstructure is 4 meter wide and only 42 cm thick. The span structure consists of 46 prefabricated segments, installed on fully tensioned bearing cables. Well foundations were used for concrete block abutments on both ends, into which the structure in anchored.

Project type
Pedestrian and cyclist bridge
Location
Irča vas, Slovenia
Year
2023
Status
Completed
Ponting Services
Wining Competition design (1. Prize) / Preliminary / Final / Detailed design
Length
130 meters
Foundation type
Anchored secant pile walls and anchored massive concrete block
Structure
Stress-ribbon bridge
Construction
Prefabricated RC segments
Client
City of Novo mesto
Cooperators
Ponting - Pipenbaher Consulting Engineers, Jereb in Budja Arhitekti d.o.o.
Awards
Golden pencil award for outstanding realization 2023 by Chamber of Architecture and Spatial Planning of Slovenia (ZAPS) - Nova Gorica, Slovenia, 2023
Plečnik Medal 2024 in the category of public space - Ljubljana, Slovenia, 2024