˝Neue Donaubrücke Linz˝ Bridge

˝Neue Donaubrücke Linz˝ Bridge ˝Neue Donaubrücke Linz˝ Bridge ˝Neue Donaubrücke Linz˝ Bridge ˝Neue Donaubrücke Linz˝ Bridge ˝Neue Donaubrücke Linz˝ Bridge ˝Neue Donaubrücke Linz˝ Bridge

2. Prize

The bridge is designed as a continuous arch-strenghten beam over 6 spans. The spans of the bridge amount 44.0 + 64.0 + 64.0 + 132.0 + 64.0 + 28.0, the total length is 396.0 m. The low arch-shaped camber in the main span allows a constant 3.25 m deep cross-section of the beam over the whole bridge length. The bridge, situated near the center of Linz, is 39.8 m wide and carries 2-lane railway, 2-lane main road and separated foot- and cycle paths on both sides.

We use cookies to provide you with a good user experience when you browse our website.
More about cookies.
I CONFIRM I AM INFORMED